Client: Elgin Energy EsCo Ltd.
Date: Aug ’17 – Dec ’17
Location: Ballygarvey Solar Farm, Ballymena, Co. Antrim

Project Details:
The Civil works package consisted of the Civil Engineering infrastructure works required for a Photovoltaic Solar farm.

Works included:

  • 200m of site access tracks
  • Construction of 33Kv substation building.
  • Visibility splays at site entrance
  • Removal of trees at site entrance
  • Surfacing of site entrance