Project Description

Client: Limavady Borough Council
Contract Period: 3 Months
Location: Burnfoot River, Ballymacran. The area is part of the Lough Foyle Wildfowl Reserve & RAMSAR (Wetlands of International Importance) designated.

Project Details:

  • Fabrication & installation of 30m long x 2m wide single span steel truss footbridge.
  • Construction of 150m access track & crane hardstanding.
  • 8 no. piles to 12m depth.
  • Formwork & construction of steel reinforced concrete abutments & steps leading to bridge