Client: Smith Bros Ltd.
Date: June ’17 – Sept ’17
Location: Maghaberry, Co. Antrim

Project Details:

The works package consisted of Civil Engineering infrastructure works required for a Photovoltaic Solar farm.  Construction of the substation building formed the main element of the contract.

Works included:

  • 200m of site access tracks
  • Construction of 33Kv substation building.
  • Electrical installation
  • Drainage and installation of ducting to facilitate installation

Similar Projects

Brett Martin Cable Trenching

Howth Looped Paths

Ballygarvey Solar Farm

Larne North Substation

Portstewart & Castlerock Fencing

Larne Main Substation

Ballintoy & Portandhu Harbour Upgrade

Struell Cemetery Civil Works

Sliabh Bawn Recreational Paths

Annaghmore East Bog Development – Galway